Ford Auditorium

"Downtown Ruins-Ford Auditorium". DetroitYES!. 2000. Retrieved January 25, 2011.  Helms, Matt (July 15, 2011).Huge excavator topples at site of Ford Auditorium

ford-construction-calculator-v15Armoured Ford construction calculator v15
from EricLestockKay, ago in
RMOURED FORD using Flexible Concrete Revetment (Armoured Concrete Block) Designed and intended to minimize environmental damage and detrimental effects to a streams ecosystem by constructing an armoured stream crossing where one or a combination of the following conditions exists; 1) POOR AVAILABILITY OF MATERIALS – Rock rip-rap (armour) is not readily available. 2) HIGH COST OF MATERIALS – Cost of generating rock is costly. (eg drilling and blasting) – Transporting rock to the site is costly. (eg long hauling distances and/or poor road conditions) 3) ACCESS TIMES COSTLY – Access for heavy machinery to the site is costly. (eg long hauling distances and/or poor road conditions) 4) ACCESS FOR TRUCKS AND MACHINERY LIMITED or RESTRICTED – Transporting rock to the site is not possible. (eg road condition is poor or unsafe or in the event access is restricted due to road failure or failed bridges etc.) – Access for heavy machinery to the site is not possible. (eg road condition is poor or unsafe or in the event access is restricted due to road failure or failed bridges etc.)


, published , pages